gold mining equipment in water
Payment Terms: |
T/T,L/C,WU |
Place of Origin: |
Shandong, China (Mainland) |
Product Detail
Model No.:
YLGEE9236
Production Capacity:
100 sets / year
Delivery Date:
20-50 working days
Application:
gold
Capacity:
100 tons per hour
Recovery rate:
80% to 85%
Means of Transport:
Ocean,Land
Packing:
Standard containers
Type:
extraction equipment
Application area:
river
Dredging depth:
15m
China alluvial gold extraction equipment
1.Capacity:100 tons per hour
2.Dredging depth:15m
3.Recovery rate:80% to 85%
China alluvial gold extraction equipmen
This type of gold extraction
equipment is specially designed,easy to operate and of high efficiency, which is applied to rivers,lakes and ponds dredging and gold recovery work.
Type | Hull Size(m) | Capacity(m3) | Dredging Depth(m) | Power(kw) | Output(m3/h) |
JLCS-A | 12×3.5 | 13 | 8-13 | 12.5-13.5KW | 20-25 |
JLCS-B | 14×3.7 | 25 | 8-15 | 13.5-15 KW | 25-30 |
JLCS-C1 | 15×4.5 | 30 | 8-15 | 13.5-15 KW | 25-30 |
JLCS-C2 | 15×4.7 | 35 | 8-15 | 13.5-15 KW | 60-80 |
JLCS-D | 18×5 | 60 | 8-25 | 50-90KW | 500-800 |
The parameters are only for reference. Customized specification is available.
Didn't find what you're looking for?
Post Buying Lead or contact
HiSupplier Customer Service Center
for help!
Related Search
Find more related products in following catalogs on Hisupplier.com