china gold machine manufacturer
Payment Terms: |
T/T,L/C,WU |
Place of Origin: |
Shandong, China (Mainland) |
Product Detail
Model No.:
YLGM80
Production Capacity:
100 sets/ year
Delivery Date:
45 working days
Application:
gold
Capacity:
80 m3 per hour
Driven method:
diesel engine or electric m...
Means of Transport:
Ocean,Land
Packing:
Two 40 feet high containers
Type:
gold machine
Application area:
river
Recovery rate:
85%
China gold mining machine
Low cost but high quality;
Dismountable, easy to transport
Low maintenance
China gold mining machine
We are the professional manufacturer suction type gold machine. There are two dredging and gold recovery systems on the machine which enables it a high capacity. We have several gold separating machines such as miner's matt/carpet, instigating sluice,centrifugal concentrator,jig,gold shaking table and so on. We will design the gold mining machine according to customers' specific mining requirements.
Technical specification for the gold mining machine
type | Hull Size(m) | Capacity(m3) | Dredging Depth(m) | Power(kw) | Pump(set) | Output(m3/h) |
JLCS-A | 12×3.5 | 13 | 8-13 | 1105-1110 | 4×6"×3 | 20-25 |
JLCS-B | 14×3.7 | 25 | 8-15 | 1110-1115 | 4×6"×3 | 25-30 |
JLCS-C1 | 15×4.5 | 30 | 8-15 | 1110-1115 | 4×6"×3 | 25-30 |
JLCS-C2 | 15×4.7 | 35 | 8-15 | 1110-1115 | 6×4"×4 | 60-80 |
JLCS-D | 18×5 | 60 | 8-25 | 50-90kw | 8×6"×1 | 500-800 |
Didn't find what you're looking for?
Post Buying Lead or contact
HiSupplier Customer Service Center
for help!
Related Search
Find more related products in following catalogs on Hisupplier.com